Earthing Details as is – Free download as Word Doc .doc /.docx), PDF File .pdf), Text File .txt) or read online for free. We REMEDIES EARTHING SYSTEMS PVT. LTD, entered the earthing & lightning industry in the early part of the ‘s much before the technological revolu on. IS Code of practice of earthing. IS Code of practice for the protection of building and allied structures against lightning.

Author: Yonos Gogore
Country: China
Language: English (Spanish)
Genre: Photos
Published (Last): 3 February 2008
Pages: 456
PDF File Size: 19.24 Mb
ePub File Size: 17.52 Mb
ISBN: 184-3-55103-503-1
Downloads: 76940
Price: Free* [*Free Regsitration Required]
Uploader: Vudorg

Facebook Linkedin Google Plus Twitter.

IS (): Code of practice for earthing | pradeep sharma –

Lines — After a line has been made dead, isolated, discharged and earthign at all points of supply, a Whilst such a spike is not generally adequate working earth should be securely 3403 to each as a primary safety earth, it will give a degree of phase eearthing the line at the point or points where work protection against energizing si induction.

Somu May 14, In this gradient in and around the work area. June 26, at 1: Alternatively, mild steel water-pipes of 38 to 50 mm diameter are sometimes employed. This, however, does of amperes. The device setting should These precautions should be adequate, but be interlinked with earth fault loop impedance, periodical tests should be made to verify that safe contact potential and permissible time for electrical continuity is satisfactorily maintained.

In addition, it is recommended that steel ding conductor shall be made secure mechanically pipe earthlng in the process units and off-site areas and electrically by using adequate metallic fitting. The earth conductors shall be of GI of minimum cross section as sq. I am unable to get 1.

A separately run circuit This standard covers distribution pillars for voltages not exceeding 1 V ac or 1 V dc, the current rating in each outgoing or incoming circuit not exceeding A, for use on ac or dc systems, in outdoor conditions. Suitable methods of jointing are a taper pin 8. Hemodialysis room M x 0 x1 x Earthing The metal casing of the distribution pillar shall be provided with two separate earthing terminals and the framework shall be metallically connected with the casing.

The NEC code requires a minimum ground electrode length of 2. The earth fault loop impedance should, therefore, be low enough to cause the protective device to operate quickly enough to give that protection as well.

  ASSO MARMITTE CATALOGO PDF

IS 3043: Code of practice for earthing

The general recommendations for lightning April 15, at The ground fault protection been a eartbing practice to apply some form of for each system voltage level should be ground fault protection. An unearthed system will be such that a conductor falling and making good subjected to resonant over-voltages.

You are commenting using your WordPress. Method b — can be used to achieve the same N O T E — If the indigeneous soil is hostile tO copper, that is, acidic with a pH value of less than 6 or alkaline with a pH value of more than 10, suitable surrounding soil should be imported. This earth electrode is an additional one for the Protection and control arrangements are not shown. The wiring on the load side of the the lighting authority.

The potential lead is is passed between the electrode A to be tested and laid in one direction and an electrode is placed an auxiliary current electrode C and the potential to metres from the fence. NOTE 4 — Items cd and e are of limited interest as they can be applied only in special situations a gas pipes; and used under effective supervision.

July 27, at 7: Please suggest the weight of the copper plate that should be placed in the earthing pit. Upto what extent as per IS code of practice purity of copper in percent has to be maintained.

But the consideration should be of the supplier to provide earthed terminal at the whether there is adequate co-ordination between premises of the consumer. August 6, at 1: The number of down conductors and earth terminals shall be determined from the Risk index as per IS Safety earthing equipment may be available as There are two further possibilities that may permanent equipment, such as earthing switches, arise: It should be located near the protective cally used from Provision P0 only.

If the uncorrected ments in various directions from the centre of the eadthing of soil resistivity is p’ and the resistance of station. Lumlang Nongkhlaw Nov 16, sarthing In such cases, residual current result in several circuits being affected if a fault operated devices sensitive to these currents occurs on one of the circuits so protected and the must be made use of for earth fault current financial advantages have to be weighed against and stable operation of the plant without the effects of loosing more than one circuit.

  BIRKLAND AN INTRODUCTION TO THE POLICY PROCESS PDF

Users of Indian Standards should ascertain that they are in possession of the latest amendments or edition by referring to the latest issue of ‘BIS Catalogue’ and ‘Standards: Resistance between two earthing pit is negligible. Dear sir In oil and gas projects we earth pipes and structures every 25 or 30 meter Do you have any calculation for this? Except for the smallest installations, to provide an effective electrode system, without there should be a connection to the earth necessity eatthing provide further buried electrodes.

The layout of the earth electrodes and earthing conductors shall be first approved by the Authorities before commencing the work. The acceptable level of the maximum sheath voltage is generally taken earhhing 65V with full may be used: Hence it is worthwhile is reasonably low. Its simplicity does exclude give thermal protection but it will earthkng be some circuit arrangements that could give the found in practice that this value is higher than the required protection.

Earth conductors when crossing through walls shall be passed through GI pipes. In example given in the article, probably single diameter of conductor is used.

If adhesive the full ground fault current b earthig t h magnitude tape is used, only bi-coloured tape shall be and duration without excessively raising the applied.

Earthing And Lightning Protection In Electrical Construction Contract Works |

Such pipes cannot be driven satisfactorily and may, therefore, be more expensive to install than plates for the same effective area. I have read but In IS recently one ammendment is issued which says that depth of the cable top from GL should be 0. Since a ing transformers. T h e true earth stratas but they may not be suitable if the site is bar should be run separately from the frame stony or has a rock sub-strata.